Project Name: Supervision Services for the Section Between Km 28-89 of the Baku-Samur Road Improvement Project / AZERBAIJAN

Country: AZERBAIJAN

Finance Source: EBRD

Partners: ECO (Belgium), AYCO ( Azerbaijan)

Tags: Azerbaijan, EBRD, Transport, Supervision

Detailed Narrative Description of Project:

The Improvement Project for the section between km 28-89 of the Baku-Samur Road (Russia Federation Border) which is characterized as a 2×2 divided carriage-way includes both services and management of construction supervision, quality control, environment and traffic safety. The Project is financed by EBRD. Hence, while the construction contract is a FDIC-based Project, the supervision contract is based on the format of international consultancy services.

Detailed Description of Actual Services Provided by TEMELSU:
• overall technical and financial administration of the contracts;
• approval of the contractors’ work programmes and sources of materials;
• approval of contractors’ working drawings;
• construction supervision of the works;
• control and appraisal of the progress of the works;
• determining the value of approved variations and fixing rates;
• issuing interim certificates for payments to the contractors on the basis of measured work items and certifying completion of all or parts of the works;
• ordering tests of materials and of completed works;
• ordering the removal of improper or substandard works;
• ensuring that environmental mitigation measures are implemented during construction and as permanent works are brought into use;
• ensuring that traffic and safety requirements (including on-site movements) are met;
• verification of “As-built” drawings supplied by the contractors,
• Advising the Employer on all matters related to the execution of the contract.
• Traffic Safety Control