All posts by cenkw

24Eki/24

The contract for the “Preparation of Rehabilitation Project for Malatya Darende Çınarköy and Doğanşehir Söğüt Reservoirs ” work was signed at Elazığ, DSI 9th Regional Directorate. (October 24, 2024)

Within the scope of the Rehabilitation Projects of Malatya Darende Çınarköy and Doğanşehir Söğüt Reservoirs, all reports approved during the planning, project and construction stages will be re-evaluated and the geotechnical andRead More…

13Eyl/24

Our Geotechnical Group Manager, Özgen Kökten successfully presented his paper named as “3D Dynamic Response of Arıklıkaş Earthfill Dam After Catastrophic Kahramanmaraş Earthquakes” at 7th EWG symposium in Athens.

Our Geotechnical Group Manager, Özgen Kökten successfully presented his paper named as “3D Dynamic Response of Arıklıkaş Earthfill Dam After Catastrophic Kahramanmaraş Earthquakes” at the International Symposium on Dams and Earthquakes organizedRead More…

26Ağu/24

A Contract for the supervision consultancy services for Stepantsminda-Gveleti Highway was signed between TEMELSU and Roads Department of the Ministry of Regional Development and Infrastructure of Georgia (26 August 2024)

The Contract for the Consultancy Services for Construction Supervision of Stepantsminda-Gveleti Section of the Mtskheta-Stepantsminda-Larsi International Highway, which connects Georgia and Russian Federation, was signed on 26 August 2024 between TEMELSU  andRead More…