Project Name: MELEN SYSTEM GREATER ISTANBUL WATER SUPPLY PROJECT CONSULTANCY SERVICES

Country: TURKEY

Finance Source: JBIC

Partners: Nippon Koei Co. Ltd.,Japan /Pilot Firm);Sir Alexander Gibb & Partners Ltd., UK; Mott MacDonald Ltd., UK; Su-Yapı-Setan-Dapta-Sial, Turkey

Tags: Turkey, JBIC, Municipal Infrastructure, Design, Supervision, Water Treatment Plant, Water Supply, Pumping Station

269 x 106 m3/year water will be supplied to İstanbul City from Melen River which will be one of the important water resources of the city. The water transmission will reach from Asia to Europe side of İstanbul with an 5.5 km long undersea (135 m below sea level) tunnel. As different type of project units requires different type of qualified contractors, the project has been divided into 11 different contract packages. The project characteristics are as follows:

 

Tunnels (all D=4m)                                                             Tanks:

Ayazağa Tunnel                     : 2.8 km                                  Osmankuyu Terminal Tank

Bosphorus Tunnel                  : 5.5 km                                  Cumhuriyet Header Tank

Ortaçeşme Tunnel                  : 0.8 km                                  Melen Header Tank

Beykoz Tunnel                        : 2.6 km                                  Dam:                                      Alacalı Dam, Height:45 m

Rock Fill Volume = 620 000 m3

Bekleme Tunnel                     : 1.3 km                                  Transmission Line:             Melen – Alaçalı Transmission Line

D=ø2500 mm, L= 131 km

Hamidiye Tunnel                    : 7.0 km                                  Pumping Station:                Melen Weir and Pumping Station

(Capacity: 8.5 m3/s)

Şile – Alaçalı Tunnel               : 3.5 km                                  Water Treatment:                 Cumhuriyet Water Treatment                                                                                                                                             Plant and Pumping Station                                                                                                                                                  (700 000 m3/day)

 

Temelsu carried out the following services: Project Management (Completed-1996), Final and detailed design of Dam, Bosphorus Tunnel, Transmission Line and Pumping Station and preparation of tender documents (Completed – 2000), Supervision and Consulting Services during construction of above project components will be provided by Temelsu (Ongoing).