Project Name: Feasibility Study and Design of Water Supply System for Abha, Khamis Mushayt and Ahad Rufeida

Country: SAUDI ARABIA

Finance Source: Government

Partners: Zuhair K.Yassin Consulting Engineers

Tags: Saudi Arabia, Government funded, Municipal Infrastructure, water supply, Pumpıng Stations, Water Treatment Plant, Feasibility Study, Design

The scope of the work consists of the preparation of feasibility report, final design and tender documents for supplying of 60 000 m3/day water to the existing transmission line, which is carrying water from desalination plant to the cities of Abha, Khamıs Mushayt and Ahad Rufeida, from the surface and underground dams which will be constructed in Itwad and Maraba valleys and the wells will be drilled in Baysh valley.

The characteristics of project are as follows:

Wadi Itwad System Baysh System
Dams Itwad Dam

Maraba Dam

Underground Dam

Caisson Wells:

 

Units: 5

Capacity of each well:  70.5 l/s

 

Caisson wells Units: 10

Capacity of each well: 50 l/s

Pumping lines from Wells to Storage Tank Ø300, ductile iron

L: 5.5 km

Conveyance System Pumping line:

D= Ø250-Ø500, ductile iron

L = 7.5 km

Reservoir 2000 m3
Reservoir 2000 m3   Treatment Plant Capacity: 25 000 m3/day

Proses : Reverse Osmosis

Pumping Station Unit: 4 (2 main + 2 stand by) Capacity:50-150 l/s Pumping Station

 

Capacity: 25 000 m3/day
Pumping Height: 80 m Gravity Line:

 

D= Ø700, ductile iron

L= 41 km

Gravity Line D= Ø250-Ø800, ductile iron

L =5 km

   
Treatment Plant: Capacity: 35 000 m3/day

Process: Reverse-Osmosis

   

 