Project Name: CENTRAL ASIA REGIONAL ECONOMIC COOPERATION CORRIDOR 3 (BISHKEK-OSH ROAD) IMPROVEMENT PROJECT, PHASE 4 – CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION

Country: KYRGYZSTAN

Finance Source: Asian Development Bank

Tags: Kyrgyzstan, Asian Development Bank, Transportation, Highway, Construction Supervision

Detailed Narrative Description of Project:

The project will improve the national and regional connectivity by reconstructing and rehabilitating an estimated 52.5 km of crucial road sections between Bishkek and Osh, and include road safety measures such as road signing, lane markings, street lighting, parking area, bus stops, crash barriers, and sidewalks.

(i) Construction Supervision for the following road sections:
a. (1) Bishkek – Kara-Balta 15+900 – 61+000 : 45,1 km
b. (2) Bishkek – Kara-Balta 8+500 – 15+900 : 7,4 km
(ii) Construction Supervision for the Performance-Based Maintenance Contract (PBMC) for the Bishkek–Osh road section from Kara-Balta to the Тoo-Ashuuu tunnel (km 61–km 129.5), total length of 68.5 km.

Detailed Description of Actual Services Provided by TEMELSU:

• Supervision and Administration – Rehabilitation phase
• Supervision and Administration – PBM phase
• Environmental Safeguards
• Social Development and Resettlement Supervision
• Road Safety Campaign
• Road Safety Audit

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir