Project Name: Feasibility and Final Design of Bisha, Aqiq, Murwani and Ranyah Dams
Country: SAUDI ARABIA
Finance Source: Government of Saudi Arabia
Partners: Zuhair K.Yassin
Tags: Saudi Arabia, Local, Feasibility, Design
TEMELSU prepared feasibility studies, final designs, technical specifications and tender documents for these four dams and all the hydrological and geological studies were undertaken by the specialists of TEMELSU. Aqiq Dam was commissioned in 1986 and since then it is in operation for water supply to Al-Baha City. The construction of Bishah dam has been completed in December 1996.
| Project Name | Dam Type | Height From Foundation (m) | Volume of Dam
Body (m3) |
Purpose
 |
| Bishah Dam | Concrete gravity | 113 | 1 500 000 | Flood control, Recharge, Irrigation |
| Aqiq Dam | Concrete gravity | 44 | 82 000 | Water Supply |
| Murwani Dam | Earth and rockfill | 100 | 6 000 000 | Flood control, Recharge |
| Ranyah Dam | Concrete gravity | 38 | 82 000 | Flood control, Recharge |