Project Name: CONSULTING SERVICES FOR THE KYRGYZ REPUBLIC IRRIGATION AND DAM REHABILITATION PROJECT, PHASE-1, PHASE -2, PHASE -3

Country: Kyrgyzstan

Finance Source: World Bank

Partners:
GIBB Ltd. (United Kingdom)

Tags: Kyrgyzstan, World Bank, HEPP, Design, Supervision

 

Narrative Description of Project:

The Consultant’s Services were carried out in three phases in a period of six years. The scope of activities for Phase-1 are:

  1. Phase -1 has a planned duration of 7 months. During this period the Consultants are expected to:
  • Carry out examinations, safety assesment and prepare detailed designs and bidding documents for the repair and safety monitoring of two priority dams (Orto-Tokoi and Karabura Dams);
  • Prepare detailed designs and bidding documents for ten schemes of rehabilitation of the irrigation and drainage infrastructure;
  • Prepare a detailed project implementation plan;
  • Conduct seminars for local contractors and suppliers and assist the MOAWR with the advertising and issuing of bidding documents.
KARABURA DAM ORTO-TOKOI DAM
Dam type Embankment Embankment
Dam height from foundation 77 m. 52 m.
Crest length 270 m. 365 m.

 

  • Phase -2 studies aim to carry out safety assessment and prepare detailed design and bidding documents for rehabilitation of  5 dams (Papan, Kirov, Ala Archa, Bazar Kurgan and Spartak Dams)  and  irrigation  infrastructure of 95 000 ha.

During this period the Consultants are expected to:

  • Assist the PIU with overall project planning, management and administration, and monitoring of project progress and performance;
  • Prepare feasibility reports for additional dam rehabilitation and for any sub-projects with considerable new works; and prepare detailed designs and bidding documents for approved sub-projects and dams;
  • Assist the PIU with construction management and supervision, including quality control; and with all procurement;
  • Organize training programs for local consultants and local contractors; and provide on-the-job training for construction supervision staff.

 

PAPAN DAM KIROV DAM ALA ARCHA DAM BAZAR KURGAN DAM SPARTAK DAM
Dam type Gravel embankment Concrete buttress

(Hollow gravity)

Homogenous silt embankment Silt and gravel embankment Silt and gravel embankment
Height from thalweg 100 m 86 m 35 m 25 m 12 m
Crest length 90 m 259 m 2100 m 2400 m 2600 m

 

  • Phase -3 consultancy studies comprise:
  • Review of contractor’s design and monitoring site investigations and assistance to PIU in construction supervision of Papan Dam;

Assistance in construction supervision of Kyrgyz Ata/Naiman headworks and canal systems, and the other irrigation sub-projects in Osh and Djalal Abad oblasts.

 

Description of Actual Services Provided by TEMELSU:

For Phase-1, 2 and 3 Temelsu provided 19 experts (dam experts, engineering geologist, hydromechanical expert, irrigation engineers, hydrologist, seismicity specialist, environmentalist, contract and construction supervision specialist, quality control expert).

 

 