Project Name: CONSULTING SERVICES FOR WASTEWATER TREATMENT PLANT OF UÅžAK ORGANIZED TANNERIES REGION

Country: TURKEY

Finance Source: UÅŸak Organized Tanneries Estate Presidency

Partners: PARMAÅž

Tags: Turkey, UÅŸak Organized Tanneries Estate Presidency, Municipal Infrastructure, Waste Water Treatment Plant, Design, Technical Assistance

Purpose of the project is to purify the wastewater for tanneries in UÅŸak. The capacity of the wastewater treatment plant is 32 000 m3/day and 1 500 000 pe with a pollution load of BOD5= 106 000 kg/day. Four major work stages included in the project are as follows:

• Water quality characterization studies for determination of wastewater quality and discharge criterias
• Feasibility Study
• Final Design
• Preparation of Tender Documents and Loan Application Report.

Detailed Description of Actual Services Provided by TEMELSU:

• Determination of economically and technically most suitable process according to the discharge water quality criterias.
• Conceptual Design of Proposed Process
• Final Design
• Pretreatment (Physical Treatment) Units
• Chemical Treatment Units
• Biological Treatment Units
• Final Sedimentation
• Sludge Dewatering Units
• Tender Documents

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir