Project Name: Urla-Çeşme Motorway
Country: TURKEY
Finance Source: Commercial Credit
Tags: Turkey, Local, Transport, Design
Design and engineering services for Urla-Çeşme section of İzmir-Çeşme Motorway between
Km: 35+800 – 85+500 (49.7 km.)
The 2 x 3-lane motorway has
– 2 park areas
– 9 interchanges (4 grade separated and 5 at-grade)
– 8.2 km. long link roads
– 4 toll areas
– 1 viaduct (930 m long)
– 90 hydraulic and 10 service box culverts
– 20 box underpasses (7.0 m x 6.0 m.)
– 2 overbridges
– 3 underbridges
– 3 interchange bridges.
• Preliminary design,
• Geological and geotechnical investigations of the whole motorway alignment (drilling, laboratory tests, reporting),
• Surveying and mapping,
• Detailed design,
The design stages comprised:
– Investigation of alignment alternatives,
– Preliminary design of the approved alignment,
– Detailed design of Motorway,
– Hydrological studies,
– Detailed design of the structures, interchanges, drainage, traffic signs, road marking, safety barriers, landscaping, parking and service areas, toll stations and related structures, lighting and communication systems.