Project Name: Consultancy Services for Conceptual Design of Katundi Hydroelectric Power Plant on Drin Zi River
Country: ALBANIA
Finance Source: Government
Partners: –
Tags: Albania, Government Financed, Dam, Consultancy, Conceptual, Design, RCC
The contract covers consultancy services for Katundi Hydroelectric Power Plant on the Drin Zi River.
Description of Services Provided by TEMELSU:
Stage I:
Conceptual designs as well as bill of quantities for all materials and works will be prepared for each of the below listed dam body types, based on existing maps.
• Roller Compacted Concrete Dam (RCC)
• Clay-core Fill Dam
• Concrete Faced Dam
Stage II:
Chosen dam body type (RCC) and bill of quantities will be updated based on the new 1/1000 scaled maps of the Katundi HEPP project area which will be provided by the Client.